Structure
Coverage may apply to listed structural components when the building is used, maintained and installed as required by the contract.
Steel building warranty overview
Structure, finish, workmanship and weather-related limits belong in the signed agreement. This overview does not replace your project-specific terms.
(209) 859-3932Terms by system
Exact years and limits must come from the current project contract. This page does not replace or expand those written terms.
| Coverage type | Cold formed | Red iron |
|---|---|---|
| Structural components | See current contract | See current contract |
| Finish and coatings | See manufacturer schedule | See manufacturer schedule |
| Workmanship | Installation agreement | Installation agreement |
| Weather-related damage | Contract exclusions apply | Contract exclusions apply |
Plain-language categories
Coverage may apply to listed structural components when the building is used, maintained and installed as required by the contract.
Coating and paint coverage follows the manufacturer schedule, environment limits and maintenance requirements stated in writing.
Installation workmanship is separate from manufacturing coverage and depends on the responsible installation agreement.
Storm, flood, impact, corrosion and loads beyond the engineered design may be excluded. Read the project-specific limits.
Making a claim
Call with the customer and project number.
Provide photographs, dates and affected components.
Avoid changes that prevent inspection unless safety requires them.
VMI confirms responsible party and written claim path.
Ask us the awkward question
The current project contract controls the exact coverage, duration, limits and exclusions.
(209) 859-3932