How it works

Every Stage, and How Long Each One Takes.

Design, approval, engineering, permits, manufacturing, delivery and erection—visible before you commit.

(209) 859-3932

The complete timeline

Eight Stages. No Mystery Middle.

Some timings depend on the project and the authority reviewing it. Each milestone, owner and dependency is confirmed in the written project schedule.

01

Design

At your pace

Set the use, dimensions, openings and location in the 3D designer or with a VMI specialist.

02

GreenLight

Permit-office dependent

VMI checks viability while the 5% initial deposit remains refundable.

03

Engineering

6–10 business days

In-house engineers coordinate stamped drawings and calculations for the reviewing authority.

04

PermitReady

Authority controlled

VMI helps file the permit and responds to project questions at no extra service fee.

05

GroundCheck

Before fabrication

Site access, grade, placement and practical delivery constraints are reviewed before steel is cut.

06

Manufacturing

2–6 weeks after approval

The approved building package enters production against the confirmed project record.

07

Delivery

Date and access confirmed

Transport, unloading expectations and the handover milestone are confirmed with you.

08

Erection

Crew schedule confirmed separately

Qualified installation support is coordinated through the UpRight network where available.

Each stage in detail

Open the Stage You Need

1. Design - At your pace

Set the use, dimensions, openings and location in the 3D designer or with a VMI specialist. The related VMI mechanism is recorded with the milestone so the buyer knows who owns the next action and what information is still required.

2. GreenLight - Permit-office dependent

VMI checks viability while the 5% initial deposit remains refundable. The related VMI mechanism is recorded with the milestone so the buyer knows who owns the next action and what information is still required.

3. Engineering - 6–10 business days

In-house engineers coordinate stamped drawings and calculations for the reviewing authority. The related VMI mechanism is recorded with the milestone so the buyer knows who owns the next action and what information is still required.

4. PermitReady - Authority controlled

VMI helps file the permit and responds to project questions at no extra service fee. The related VMI mechanism is recorded with the milestone so the buyer knows who owns the next action and what information is still required.

5. GroundCheck - Before fabrication

Site access, grade, placement and practical delivery constraints are reviewed before steel is cut. The related VMI mechanism is recorded with the milestone so the buyer knows who owns the next action and what information is still required.

6. Manufacturing - 2–6 weeks after approval

The approved building package enters production against the confirmed project record. The related VMI mechanism is recorded with the milestone so the buyer knows who owns the next action and what information is still required.

7. Delivery - Date and access confirmed

Transport, unloading expectations and the handover milestone are confirmed with you. The related VMI mechanism is recorded with the milestone so the buyer knows who owns the next action and what information is still required.

8. Erection - Crew schedule confirmed separately

Qualified installation support is coordinated through the UpRight network where available. The related VMI mechanism is recorded with the milestone so the buyer knows who owns the next action and what information is still required.

What we need from you

Three Inputs Prevent Rework

The actual address or parcel

The jurisdiction, wind, snow and seismic requirements start with the real project location.

What will be inside

Vehicles, equipment, livestock, people and storage needs shape spans, openings and clearances.

The real budget

BudgetFit uses the available number to guide tradeoffs before drawings are finalized.

If something changes

Changes Are Documented, Not Hidden

Design changes can affect engineering, permits, fabrication and delivery. VMI records the requested change, identifies the affected milestone and confirms any schedule or cost impact before proceeding. Authority comments and site discoveries are handled the same way: the project record shows what changed, why it changed and what must happen next.

Your project record

MyVMI Keeps the Next Step Visible

Status, drawings, documents and payments stay connected to one live project record so you do not have to chase a callback.

Ask us the awkward question

Know What Happens Next

Nothing here commits you to anything. We confirm the site, code and configuration before asking you to commit.